Decades of steel. Thousands of structures. One standard of quality.

Find out more
PRE-ENGINEERED METAL BUILDINGS
Wasatch Structures · Building Kits

PRE-ENGINEERED METAL BUILDINGS

Factory-fabricated steel building systems engineered for your specific span, load, and use

Overview

Engineered Steel, Field-Ready

Pre-engineered metal buildings (PEMB) are designed and fabricated in a controlled factory using standardized components engineered to your specific span, height, and load requirements. The pre-engineering shortens schedule, tightens cost, and gives owners predictable delivery.

We deliver complete PEMB packages: stamped engineered drawings, primary frames, secondary framing, bracing, panels, trim, fasteners, and roll-up doors. Erection by our crew or yours.

The advantage

Every decision evaluated against the pro forma. One team, one accountability path, one schedule from concept through certificate of occupancy.

Engineered to Your Site

Frames sized for the specific snow, wind, seismic, and live loads of your jurisdiction. Stamped drawings included.

Clear-Span Up to 200 Feet

Column-free interior spans up to 200 feet wide. Maximum flexibility for storage, manufacturing, or warehouse use.

Predictable Schedule

Factory fabrication runs parallel to site work. Steel arrives on the agreed date with all components labeled and pre-punched.

Cost Control

Pre-engineered systems eliminate field surprises. Steel cost is locked in before the foundation is poured.

Insulated Envelope Options

Insulated wall and roof panels for climate-controlled or energy-conscious applications.

Erection Support

Owner-erected with our remote technical support, third-party erected, or turnkey erection by our crew.

FAQ

Questions

A pre-engineered metal building is a steel structure designed and fabricated in a controlled factory using standardized components engineered to your specific span, height, and load requirements. Primary frames, secondary framing (purlins and girts), bracing, trim, and fasteners are pre-cut, pre-punched, and labeled, then shipped to site for assembly. The pre-engineering cuts cost and shortens the schedule versus stick-built or conventionally engineered steel.

Engineering and approval drawings: 4 to 6 weeks after contract. Fabrication: 8 to 14 weeks after approved drawings. So 12 to 20 weeks from signed contract to steel arriving on site. Site work and foundation can run in parallel.

Clear-span widths up to 200 feet without interior columns. Lengths are essentially unlimited (added in bay increments, typically 25-foot bays). Eave heights from 12 feet to 40+ feet. Roof slopes from 1:12 (low-slope) to 4:12 (architectural).

Yes. Our kits ship with stamped engineered drawings, complete erection drawings, anchor bolt plans, and all fasteners. Crews experienced with steel erection, equipment rental for a crane and lifts, and standard PPE are required. We provide remote technical support throughout erection. For owners without erection experience or capacity, we offer turnkey erection.